Click on any of the claims below to learn more.
1. CLAIM / MYTH: Only a small portion of gravel will be extracted from
below the water table.
2. CLAIM / MYTH: This pit will be developed in successive phases and the
large majority of the land will be available for farming at all times.
3. CLAIM / MYTH: The site will be rehabilitated back to full agricultural
use in 7-10 years.
4. CLAIM / MYTH: Capital Paving is a small company.
5. CLAIM / MYTH: Although Letson Drive, the road through the proposed pit, will be rerouted, vehicle and horse-and-buggy traffic will be able to pass as usual.
6. CLAIM / MYTH: The pit isn’t “that close” to the covered bridge.
7. CLAIM / MYTH: The land will be returned to the farmers in better
condition for agriculture than before the excavation.
|